Software Interface in Engineering Applications
The evolution of personal computer (PC) software has reached the point where most major types of software will interact. The ability of PC programs to share various texts, graphics and...

Predicting the Impact from Significant Storm Events on a Hazardous Waste Site
The Stringfellow Hazardous Waste Site is a former Class I industrial waste disposal facility located near the community of Glen Avon in southern California. In response to community concerns...

Environmental Effects of Flooding at a USCG Base
In July of 1993, the U.S. Coast Guard (USCG) Base St. Louis facility was flooded. As the flood waters receded and cleanup efforts were initiated, a number of environmental issues had to...

Malaysia's Twins: High-Rise, High Strength
U.S. firms, following the market for new skyscrapers to Asia, are involved in design and construction of twin office towers in the commercial heart of Kuala Lumpur, Malaysia that will...

A Thousand Points of Data
Significant cracking was discovered in a multistory parking garage shortly after construction. Was it safe to open? Based on visual inspection, a bridge was down-rated, with potential...

Light at the End of the Chunnel
While the construction of the Channel tunnel was an engineering triumph, the project also had its share of cost overruns, inadequately prepared contract documents, and disputes over safety...

Aviation Crossroads
Challenges in a Changing World
This proceedings, Aviation Crossroads - Challenges in a Changing World, includes papers presented at the 23rd International Air Transportation...

Critical Issues in Water and Wastewater Treatment
This proceedings, Critical Issues in Water and Wastewater, contains short versions of most of the 114 papers presented at the 1994 Specialty...

Safety at the Site
The engineer should not be responsible for safety at the construction site. Most standard contract documents allocate this responsibility in construction means, methods and sequences to...

Glossary of the mapping sciences
The Glossary of Mapping Sciences, a joint publication of the American Congress on Surveying and Mapping (ACSM), American Society for Photogrammetry...

Constructing Around Contamination
When soil and ground water contamination are found at a construction site, completing the project on time and within budget is always a challenge. Typical problems include constraints...

Spoils of War
Watertown Arsenal, a former U.S. Army arsenal and nuclear research site noted for its innovations in armament technology, has been shut down and is destined to be returned to civilian...

Quality Assurance for Hazardous-Waste Projects
An important aspect of an environmental Quality Assurance (QA) Program, as with any system designed to improve quality of performance, is the specification of objectives which, if met,...

Policy Options and Highway Capacity Needs
One of the recurring criticisms levelled against FHWA's Report to Congress on the Status of the Nation's Highways is that the Report does not go far enough in examining the implications...

Using License Plate Survey Data in Transportation Planning Applications
This paper is a presentation of the methodology used by the Baltimore Regional Council of Governments to conduct a multi-faceted study for the Maryland Aviation Administration, which operates...

Large-Truck Safety Decision Support System
Large trucks, defined here as trucks having six or more wheels and a gross weight greater than 10,000 pounds, present a difficult safety problem to our nation's transportation system....

Analysis of Vessel and Vehicle Queues at Moveable Bridges
This paper describes procedures and the analysis developed to evaluate three different replacement options for the existing S.E. 17th Street Causeway moveable bridge which crosses the...

Estimating Load Impacts on Highway Structures Using the National Bridge Inventory Database
The issuance of single and multiple permits to operate vehicles exceeding legal weight limits, along with the policy-level analysis of bridge impacts induced by changes in vehicle size...

Computer Applications on the Central Artery/Tunnel Project
Boston's Central Artery/Tunnel (CA/T) project consists of the reconstruction of a 4.2 mile segment of Interstate Route 93 in downtown Boston, a 3.3 mile extension of Interstate Route 90...

A Peak Hour High Capacity Reservation and Person-Based Functional Classification Concept for Urban Mobility Plans and Corridor Growth Management
The management of future growth and mobility in urban corridors and areas has been based in part upon use of the Levels of Service and procedures of the Highway Capacity Manual. Capacity...

 

 

 

 

Return to search